Testing and inspection

Commercial Electricians for Fire Safety and Remedial Works

Qualified electricians for remedial works, board upgrades, fire-rated containment and landlord supplies in commercial and residential buildings.

Fire safety and electrical safety overlap more than most people expect. Faulty wiring is a common cause of fires, cable installations can break compartment lines, and plastic cable clips in escape routes can drop cables during a fire and trap firefighters. Since 2019, BS 7671 has required wiring systems in escape routes to be supported against premature collapse.

Our electricians clear EICR remedials, upgrade distribution boards, replace landlord supplies in blocks of flats, fire-stop service penetrations they have created, and install fire-rated containment. Every job comes with the right BS 7671 certificate.

What is included

  • EICR remedial works
  • Consumer unit and distribution board upgrades
  • Landlord supply and communal lighting works
  • Fire-resisting cable supports in escape routes
  • Fire stopping of new service penetrations
  • Electrical installation and minor works certificates

Who it is for

  • Commercial landlords
  • Managing agents
  • Facilities managers
  • Retail and hospitality
  • Industrial estates

The rules in each UK nation

England

Private landlords in England must have the electrical installation inspected and tested at least every five years under the Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020, and give tenants a copy of the report.

Wales

Landlords in Wales must have an electrical condition report at least every five years and give the contract holder a copy, under the Renting Homes (Wales) fitness regulations.

Scotland

Private landlords in Scotland must have an Electrical Installation Condition Report at least every five years and PAT testing of any appliances they supply, under the Repairing Standard.

Northern Ireland

Landlords of private tenancies in Northern Ireland must have the electrical installation inspected at least every five years under the Private Tenancies (Northern Ireland) Order 2006 as amended.

How a job runs

  1. Tell us about the building

    Use the form or send us your fire risk assessment action plan. A few details on height, use and current systems are enough to start.

  2. Survey or desktop review

    Where we need to see the building, we visit. For some jobs, such as EWS1 scoping, we start with the documents you already hold.

  3. Fixed quote

    You get a written, fixed price with a clear scope. Nothing chargeable happens without your approval.

  4. Work and certification

    Our engineers carry out the work and leave the right certificates, photographs and logbook entries.

  5. Records and reminders

    Reports are filed by building and we remind you before the next test, inspection or review is due.

Questions we are often asked

Can you fix the faults on our EICR?

Yes. We quote each coded item separately, carry out the work, and issue the relevant certificates so the report can be closed out.

Commercial electrical work near you

We provide commercial electrical work in every town and city below, and everywhere in between.

England

Request a quote

Tell us about the building and what you need. We reply within one working day with next steps or a fixed quote.

  • Fixed prices, agreed before any work starts
  • Written reports and certificates for every visit
  • Coverage across England, Scotland, Wales and Northern Ireland